3d Layout:
We start last week to block out the layout and this week we are aiming to finish the camera movements and assemble all the scenes into a single video to be able to start the animation stage ASAP. I was assigned the scenes 1, 2 and 6. Below are the videos.
Scene 01:
Scene 02:
Scene 06:
Total Time: 4 Hours and 50 Minutes
Compositing Test:
Also, I continue to do more tests for the camera point of view compositing to get feedback ahead of time and don't worry too much of that in post production. For today I was aiming to finish a test with guidelines on the corners of the phone and the phone fissure/crack effect (for the scene in which the bird breaks the screen and if the phone is needed to preserve that effect along the short film). Below is the video.